A material requirements plan contains information with regard to all of the following except


A) quantities and required delivery dates of all subassemblies.
B) quantities and required delivery dates of final products.
C) the capacity needed to provide the projected output rate.
D) inventory on hand for each final product.
E) inventory on hand for each subassembly.

F) A) and C)
G) None of the above

Correct Answer

verifed

verified

A bill of material lists all components, ingredients, and materials needed to produce one unit of an end item.

A) True
B) False

Correct Answer

verifed

verified

What does enterprise resource planning (ERP) allow an organization to do?

Correct Answer

verifed

verified

It allows them to automate and integrate...

View Answer

By convention, the top level in a bill of material is designated level 1.

A) True
B) False

Correct Answer

verifed

verified

Operations splitting sends pieces to the next operation before the entire lot is completed on the previous operation.

A) True
B) False

Correct Answer

verifed

verified

Which portion of the master production schedule is normally fixed, frozen, or firm?


A) the entire schedule
B) only the aggregate schedule
C) only the middle of the schedule
D) only the near-term portion
E) only the far-term portion

F) C) and E)
G) A) and C)

Correct Answer

verifed

verified

It is week 1 and there are currently 20 As in stock. The MPS calls for 300 As at the start of week 5. If there are scheduled receipts planned for week 3 and week 4 of 120 As each and A has a lead time of 1 week when and how large of an order should be placed to meet the requirement of 300 As?


A) Week 1, 300 As
B) Week 1, 40 As
C) Week 5, 40 As
D) Week 4, 40 As
E) Week 4, 300 As

F) A) and D)
G) A) and B)

Correct Answer

verifed

verified

What do we mean by closed-loop MRP?

Correct Answer

verifed

verified

Closed-loop MRP indicates that (a) there...

View Answer

Three A washers, four B washers, three C bolts, and a D bolt are required to make one Grill parts kit. If 200 grill part kits are needed how many more washers will be consumed than bolts?

Correct Answer

verifed

verified

Using MRP explosion gives A:60...

View Answer

A process-focus facility (for example, a print shop) will likely schedule ________ as the focus of its master production schedule.

Correct Answer

verifed

verified

Since MRP is quite detailed in nature, it has no influence on the longer-range, less detailed aggregate planning.

A) True
B) False

Correct Answer

verifed

verified

Each R requires 3 of component S and 3 of material A; each S requires 3 of part T. The lead time for assembly of R is 1 week. The lead time for the manufacture of S is 2 weeks. The lead time for material A is 1 week. The lead time for the procurement of T is 4 weeks. a. Construct the time-phased product structure. b. Construct the bill of material.

Correct Answer

verifed

verified

The bill of material contains information necessary to


A) place an order to replenish the item.
B) calculate quantities on hand and on order.
C) convert net requirements into higher level gross requirements.
D) convert gross requirements into net requirements.
E) convert (explode) net requirements at one level into gross requirements at the next level.

F) A) and C)
G) D) and E)

Correct Answer

verifed

verified

The Aggregate Plan, derived from the Master Production Schedule, specifies in more detail how much of which products is to be made at what times.

A) True
B) False

Correct Answer

verifed

verified

A document calls for the production of 50 small garden tractors in week 1; 50 small garden tractors and 100 riding mowers in week 2; 100 riding mowers and 200 garden utility carts in week 3; and 100 riding mowers in week 4. This document is most likely a(n)


A) net requirements document.
B) resource requirements profile.
C) aggregate plan.
D) master production schedule.
E) Wagner-Whitin finite capacity document.

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

What information is necessary for an operations manager to make effective use of a dependent inventory demand model?

Correct Answer

verifed

verified

The information necessary for an operati...

View Answer

A(n) ________ system is packaged business software that automates and integrates the majority of their business processes, shares common data and practices across the entire enterprise, and produces and accesses information in a real-time environment.

Correct Answer

verifed

verified

enterprise...

View Answer

MRP can be effective only if very accurate lot sizes are calculated in advance.

A) True
B) False

Correct Answer

verifed

verified

What is DRP?

Correct Answer

verifed

verified

DRP is a time-phased...

View Answer

Which of the following is not a disadvantage of ERP systems?


A) They involve an ongoing process for implementation, which may never be completed.
B) They have software that is off-the-shelf coding.
C) Expertise in ERP is limited, with staffing an ongoing problem.
D) They are so complex that many companies cannot adjust to them.
E) Implementation may require major changes in the company and its processes.

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

Showing 41 - 60 of 184